RCSI Clinical Science, Beaumont Hospital
Client: | RCSI |
Architect: | R. Hurley & Associates |
Consultant: | VMRA |
Value: | €1,912,000 |
New Building adjacent to main existing Beaumont Hospital Complex. The building houses the Clinical Sciences facility for the RCSI, and includes day wards, laboratories, dark rooms, cold stores, boardrooms etc
Systems installed included:
- Roof Steam plant, heat exchangers and LPHW distribution to all floors
- Roof Chilled plant and distribution to all floors
- Medical Gas Systems
- Central Ventilation Systems
- Fume cupboard extract systems
- Complete Soils & Wastes
- All water services
- Building Management System
Primary Care Centre, Drogheda
Client: | HSE |
Architect: | Hussey Architects |
Consultant: | Metec |
Value: | €825,000 |
This project involved the renovation of an existing office block to provide a Primary care centre for the HSE.
Systems installed included:
- Boilerhouse, plant and distribution
- Water storage, plant and distribution including rain water harvesting
- Complete Soils & Wastes
- Air Conditioning
- Ventilation from Central Plant
- Building Management System
Pathology Department, Beaumont Hospital, Upgrade of existing Laboratories
Client: | Beaumont Hospital |
Consultant: | WS Atkins |
Value: | €934,000 |
Fit-Out of new Pathology Laboratory in the existing building, which also allowed for phasing to ensure minimal interference with the Hospital operation. The area involved was one of the most sensitive area in the hospital and therefore all areas remained open throughout the contract period.
Systems installed included
- New AHU systems with heating and DX cooling
- VAV boxes to laminar flow panels
- New Pathology Benches and equipment
- Water & Waste systems
- Electrical installation
- Partitions, Ceilings etc
- Building Management System
TEMEC |
MEDICAL AND INSTITUTIONAL PROJECTS |
|||||
Ref | Title | Client | Architect | Engineer | Main Contractor | Value |
---|---|---|---|---|---|---|
3232 | Primary Care Unit, Boyne Centre, Drogheda | Albert | Hussey Architects | Metec | Walls Construction | €825,000.00 |
3085 | St Marys Church Boilerhouse | Dominican Community | n/a | Metec | Temec | €14,826.00 |
1710 | Malahide Parish Centre | Malahide Parish | Delap & Waller | Duggan Bros | €351,000.00 | |
1453 | St Patricks Nursing Home Extension, Baldoyle | St Patricks Nursing Home | n/a | Axis | N/a | €268,519.00 |
1432 | St Josephs Hospital Kitchen, Raheny | Health Board | Murray O’Laoire Arch | VMRA | BAM | €220,000.00 |
1211 | St Patricks Church Slane, new heating installation | Parish of slane | Richard Hurley & Assoc | MMA | Ledwidge Construction | €101,647.20 |
1156 | Tri Province Centre, Retirement Home for clergy | Christian Brothers | BKD | Delap & Waller | Moston | €515,096.77 |
1153 | Fr. Mathew Hall, Dublin | Fr. Mathew Hall | Scott Tallon Walker | MMA | n/a | €226,802.00 |
1012 | DMMC Eccles Street | DMMC | TP Kennedy | MMA | M&P Construction | €303,704.00 |
920 | Pathology Department, Beaumont Hospital, Upgrade of existing Laboratories | Beaumont Hospital | n/a | WS Atkins | Temec | €934,000.00 |
674 | RCSI Clinical Science, Beaumont Hospital | Royal College of Surgeons | R. Hurley & Assoc | VMRA | McNamara | €1,912,187.21 |
658 | Womens Prison, Mountjoy – 9No. Administration & 6No. Cell Blocks | OPW | OPW | Homan O’Brien | €1,826,260.00 | |
529 | Convalescent Home, Beaumont Hospital | Sisters of Mercy | Project Dev Partnership | Asco Engineering | Mathew Wallace Ltd | €231,435.00 |
527 | International Spawn Laboratory, Navan | Spawn Laboratory | Fitzgerald Reddy Assoc | MMA | Midland Engineering | €93,000.00 |
Follow Us