Medical & Institutional

RCSI Clinical Science, Beaumont Hospital

Client: RCSI
Architect: R. Hurley & Associates
Consultant: VMRA
Value: €1,912,000

New Building adjacent to main existing Beaumont Hospital Complex. The building houses the Clinical Sciences facility for the RCSI, and includes day wards, laboratories, dark rooms, cold stores, boardrooms etc

Systems installed included:

  • Roof Steam plant, heat exchangers and LPHW distribution to all floors
  • Roof Chilled plant and distribution to all floors
  • Medical Gas Systems
  • Central Ventilation Systems
  • Fume cupboard extract systems
  • Complete Soils & Wastes
  • All water services
  • Building Management System

Primary Care Centre, Drogheda

Client: HSE
Architect: Hussey Architects
Consultant: Metec
Value: €825,000

This project involved the renovation of an existing office block to provide a Primary care centre for the HSE.

Systems installed included:

  • Boilerhouse, plant and distribution
  • Water storage, plant and distribution including rain water harvesting
  • Complete Soils & Wastes
  • Air Conditioning
  • Ventilation from Central Plant
  • Building Management System

Pathology Department, Beaumont Hospital, Upgrade of existing Laboratories

Client: Beaumont Hospital
Consultant: WS Atkins
Value: €934,000

Fit-Out of new Pathology Laboratory in the existing building, which also allowed for phasing to ensure minimal interference with the Hospital operation. The area involved was one of the most sensitive area in the hospital and therefore all areas remained open throughout the contract period.

Systems installed included

  • New AHU systems with heating and DX cooling
  • VAV boxes to laminar flow panels
  • New Pathology Benches and equipment
  • Water & Waste systems
  • Electrical installation
  • Partitions, Ceilings etc
  • Building Management System

TEMEC

MEDICAL AND INSTITUTIONAL PROJECTS

Ref Title Client Architect Engineer Main Contractor Value
3232 Primary Care Unit, Boyne Centre, Drogheda Albert Hussey Architects Metec Walls Construction €825,000.00
3085 St Marys Church Boilerhouse Dominican Community n/a Metec Temec €14,826.00
1710 Malahide Parish Centre Malahide Parish   Delap & Waller Duggan Bros €351,000.00
1453 St Patricks Nursing Home Extension, Baldoyle St Patricks Nursing Home n/a Axis N/a €268,519.00
1432 St Josephs Hospital Kitchen, Raheny Health Board Murray O’Laoire Arch VMRA BAM €220,000.00
1211 St Patricks Church Slane, new heating installation Parish of slane Richard Hurley & Assoc MMA Ledwidge Construction €101,647.20
1156 Tri Province Centre, Retirement Home for clergy Christian Brothers BKD Delap & Waller Moston €515,096.77
1153 Fr. Mathew Hall, Dublin Fr. Mathew Hall Scott Tallon Walker MMA n/a €226,802.00
1012 DMMC Eccles Street DMMC TP Kennedy MMA M&P Construction €303,704.00
920 Pathology Department, Beaumont Hospital, Upgrade of existing Laboratories Beaumont Hospital n/a WS Atkins Temec €934,000.00
674 RCSI Clinical Science, Beaumont Hospital Royal College of Surgeons R. Hurley & Assoc VMRA McNamara €1,912,187.21
658 Womens Prison, Mountjoy – 9No. Administration & 6No. Cell Blocks OPW OPW Homan O’Brien €1,826,260.00
529 Convalescent Home, Beaumont Hospital Sisters of Mercy Project Dev Partnership Asco Engineering Mathew Wallace Ltd €231,435.00
527 International Spawn Laboratory, Navan Spawn Laboratory Fitzgerald Reddy Assoc MMA Midland Engineering €93,000.00